Demolition of the redundant car workshops on the site and Design & Build two no retail/leisure shell units for occupation by Aldi, Poundworld and Pure Gym.
The works involved;
The removal of significant in-situ concrete basements on the site
Japanese Knotweed removal
Protecting and maintaining the culvert for the water course that crosses the site.