<?xml version="1.0" encoding="UTF-8"?><rss version="0.92">
<channel>
	<title>Harris Construction Management</title>
	<link>http://www.harriscm.co.uk</link>
	<description></description>
	<lastBuildDate>Wed, 22 Feb 2012 18:59:19 +0000</lastBuildDate>
	<docs>http://backend.userland.com/rss092</docs>
	<language>en</language>
	<!-- generator="WordPress/3.2.1" -->

	<item>
		<title>2 NEW restaurants for Nando’s</title>
		<description><![CDATA[hcm interiors have completed two further restaurants for Nando’s at Edinburgh and Ashford (Kent) at a combined value of £2.1m within the respective programme’s. The Edinburgh facility was a former four story Royal Bank of Scotland Bank and the Ashford project is the first “stand only” retail park restaurant completed by hcm interiors. Further details [...]]]></description>
		<link>http://www.harriscm.co.uk/2012/01/29/2-new-restaurants-for-nando%e2%80%99s/</link>
			</item>
	<item>
		<title>Residential award –  Deptfold, London</title>
		<description><![CDATA[hcm projects have negotiated with KG Projects to build a complex of six apartments along with two commercial units in Deptford High Street, London. This 24 week construction project, value £600k will provide ideal apartments for professional people who work in the City or Canary Wharf. The building combine’s steel and timber construction is located [...]]]></description>
		<link>http://www.harriscm.co.uk/2012/01/15/residential-award-%e2%80%93-deptfold-london/</link>
			</item>
	<item>
		<title>Asda – Yorkshire XDC – South Elmsall</title>
		<description><![CDATA[hcm projects have now completed this initial 21 week contract, value £3.65m for Asda to the former Netto warehouse at South Elmsall. The work consists of the refurbishment to this former Netto distribution centre to allow Asda to operate this warehouse as a chilled and ambient cross dock (XDC) facility. This 249,000 sq.ft. building will [...]]]></description>
		<link>http://www.harriscm.co.uk/2012/01/15/asda-%e2%80%93-yorkshire-xdc-%e2%80%93-south-elmsall/</link>
			</item>
	<item>
		<title>2012 Asda Investment Programme</title>
		<description><![CDATA[hcm facilities have successfully re-negotiated with Asda the 2012 Distribution Capital and Revenue investment programme, circa £5m. This nationwide programme covers items such as maintaining and renewal of building envelopes, office and welfare areas, chill facilities, fuelling systems, docking bays, external yards and car parks, etc.]]></description>
		<link>http://www.harriscm.co.uk/2012/01/15/2012-asda-investment-programme/</link>
			</item>
	<item>
		<title>Warehouse base build on 22 acre site at Wynyard Park, Teesside</title>
		<description><![CDATA[hcm projects have commenced their role as advisors to the Client, Clipper Logistics Group for the base build of a 342,000 sq/ft, cross docked warehouse on a 22 acre site at Wynyard Park, Teesside. This is the prelude to our main role as the Project Managers for the £7.25m fit out works on behalf of [...]]]></description>
		<link>http://www.harriscm.co.uk/2012/01/15/warehouse-base-build-on-22-acre-site-at-wynyard-park-teeside/</link>
			</item>
	<item>
		<title>Goodman Restaurants at Canary Wharf and Mayfair</title>
		<description><![CDATA[hcm interiors have completed the two new restaurants for Goodman at Canary Wharf and Mayfair within the budget of £1.2m and programme. The Canary Wharf restaurant is has an exciting riverside location whilst the new prestigious Mayfair “Burger and Lobster” restaurant boasts an 11 metre bar. Further information on both of these projects can be [...]]]></description>
		<link>http://www.harriscm.co.uk/2012/01/15/goodman-restaurants-at-canary-wharf-and-mayfair-%e2%80%93-december-2011/</link>
			</item>
	<item>
		<title>Nando’s restaurant is completed at Great Portland Street, London</title>
		<description><![CDATA[Another Nando’s restaurant is completed at Great Portland Street, London within the 13 week programme and cost of £1m, including the management of the client’s direct suppliers and sub-contractors. This former two story Lloyds Bank building has been converted into an outstanding new Nando’s restaurant including new frontage, and some unusual internal features such as: [...]]]></description>
		<link>http://www.harriscm.co.uk/2011/08/15/nando%e2%80%99s-restaurant-is-completed-at-great-portland-street-london/</link>
			</item>
	<item>
		<title>Asda Distribution- installation of a further 20 Double Deck loading bay door system’s</title>
		<description><![CDATA[HCM have commenced the second phase of the supply and installation of a further 20 Double Deck loading bay door system’s at various locations within the Asda distribution warehouse network. This phase of Asda’s programme will be completed within  eight weeks at a cost of £900k]]></description>
		<link>http://www.harriscm.co.uk/2011/08/15/asda-distribution/</link>
			</item>
	<item>
		<title>Asda, Warrington- Re-furbishment works. HCM have completed another project for Asda with the re-furbishment of the existing distribution facility at Warrington. Read more</title>
		<description><![CDATA[HCM have completed another project for Asda with the re-furbishment of the existing distribution facility at Warrington. The extensive range of works to this 375,000 sq.ft. building was completed within the 10 week programme and budget of £750k. The re-furbished building will enable this distribution centre to operate as a XDC facility (cross docking system [...]]]></description>
		<link>http://www.harriscm.co.uk/2011/05/10/asda-warrington-re-furbishment-works-hcm-have-completed-another-project-for-asda-with-the-re-furbishment-of-the-existing-distribution-facility-at-warrington-read-more/</link>
			</item>
	<item>
		<title>Asda &#8211; Various Distribution Centres. HCM have completed the supply and installation of 39 Double Deck Loading bay door systems to various centres in the Asda distribution network system within the 10 week programme and cost of £1.2m.</title>
		<description><![CDATA[370 is the number of single vehicle journeys saved each year for every double deck trailer used by Asda in place of the conventional type of  single deck trailer. The significant use of these double deck trailers reduces the impact of deliveries of essential  goods to Asda stores in city/town centres as well as reducing [...]]]></description>
		<link>http://www.harriscm.co.uk/2011/05/10/asda-various-distribution-centres-hcm-have-completed-the-supply-and-installation-of-39-double-deck-loading-bay-door-systems-to-various-centres-in-the-asda-distribution-network-system-within-the-10/</link>
			</item>
</channel>
</rss>

